Method, plainly
How a survey actually gets done.
Same six stages whether it is a single building or a year of monitoring. The stages that clients rarely see are the ones that decide whether the deliverable is worth anything.
01
Enquiry and triage
Same working day
You send the address, what it is for and your deadline. I work out which survey is actually needed — sometimes that is not the one you asked for, and I will say so. If it is outside the area or outside my competence, you hear that now rather than in three weeks.
You receive
- →A definite recommendation
- →An indicative price
- →A realistic programme
02
Records and desk research
Before mobilising
Historic OS maps, title plans, existing service records, flood zones, planning history and any control already in the area. Desk work regularly removes the need for a return visit, and it gives me something to check the field observations against rather than starting from nothing.
You receive
- →A plan of what is already known
- →A list of gaps to fill on site
03
Site visit
Usually one day
Control first, detail second. Nothing is measured until there is something proved to measure it from. Independent check points are placed and left unmoved, so the accuracy claim can be demonstrated rather than asserted. Where aerial capture is part of the job, the flight is planned before arrival and flown in a single window if possible.
You receive
- →Observed control and check residuals
- →Raw instrument and GNSS observations
04
Adjustment and quality control
Before any drawing
The network is adjusted and the check residuals reported honestly. If the control does not meet the accuracy the job needs, it gets re-observed. This is the stage most firms skip, and it is the reason a control figure can be trusted when it appears on a drawing.
You receive
- →Adjusted coordinates
- →A stated accuracy figure, not a target one
05
Processing and drafting
Two to five working days
Data reduced, features coded, and the deliverable produced in the format you specified. Point clouds are registered, classified and checked. Drawings are drawn from the adjusted data rather than sketched on site and tidied up later.
You receive
- →Deliverables in your requested format
- →The raw data alongside them
06
Handover and support
On issue
You get the files, a written statement of accuracy achieved and any limitations, and a direct line for questions. If something in the data does not make sense when you open it, that is a conversation rather than a dispute.
You receive
- →Files and a written accuracy statement
- →Someone to ask
Non-negotiables
Six things that are true of every job.
- Every figure traceable to an observed, adjusted control point.
- Accuracy stated as achieved, not as hoped for.
- Open data formats. No licence fee to re-read your own survey.
- Limitations written next to the claim they qualify.
- Fieldwork completed before a programme is promised, never after.
- Raw observations available on request, for any job.
Turnaround
What to expect, and when to push.
- Reply to an enquiry
- Within one working day
- Single site fieldwork
- Usually one day on site
- Drawing issued
- Two to five working days after fieldwork
- Point cloud registered
- Two to three working days for a typical site
These are the figures for a normal job. Litigation, live construction and monitoring programmes run differently, and you will be told which category yours falls into before you commit.
The accuracy, stated once
Repeated on every service page because it is the number that matters, and because a surveyor who will not state one is telling you something.
- Horizontal control
- ±10mm typical
- Vertical control
- ±8mm typical
- Registered point cloud
- ±5–10mm
- Aerial reconstruction
- ±30mm with control
These are the control figures, not the accuracy of every point in every deliverable. Aerial work over vegetation, non-invasive service detection and thermal imaging each have their own limits, and every deliverable comes with a written statement of what it can and cannot be relied on for.
Start a job
Tell me the site and the deadline.